Public Deliverables
- D1.2 Project Management Plan
- D1.3 Risk Management Plan
- D1.4 18 month Midterm Report
- D2.1 Initial Dissemination Plan (Strategy)
- D2.2 Interim Plan for Use and Dissemination of the Results (PUDR)
- D2.4 Project Website
- D2.5 Data Management Plan
- D3.1 Report on the Data Characteristics of Each Stream Derived From the CDW
- D3.3 Recycled Concrete Aggregates
- D4.1 Full Characterization of the Separated Waste Concrete and Ceramic
- D4.2 Datasheet of Concrete and Ceramic Waste Streams
- D5.1 Report on the Fire and Insulation Design
- D5.3 Material Prototype with Fire and Insulation Properties in Sandwich Type
- D6.2 Flowsheet with the material production for 3D printing and precast
- D6.3 Material Data Sheet with The Most Crucial Properties
Downloads
Apps |
Letterhead |
Logo
|